Case Study: Automated Control System in Russia

    Next Case Study»



Trusted Service,
Expert Solutions.

ABDM Inc, a local engineering company, was looking for an HVAC energy management firm capable of designing and building an automated temperature control system for installation in a new state-of-the-art cardiac care facility in downtown Moscow, Russia.

Binsky and Snyder Service Inc. worked closely with the engineering staff at ABDM and a Russian engineering firm to develop a design. Using state-of-the-art Honeywell Excel 5000 control components and various automated valves, the Binsky project team completely automated the new hospital’s physical plant by controlling the boilers and chillers to provide the facility with comfortable heating, cooling and domestic hot water.

The entire automated control system – which included actuators, controllers, built-up automated control panels, valves and installation instructions – was manufactured at Binsky Services’ Piscataway, New Jersey facility, then packaged for shipment to Moscow, Russia.

The Honeywell control system was shipped containing all proper paperwork necessary for overseas shipment to France and overland transportation to Russia.

The system was cleared by Russian customs agents and installed by Russian electricians using installation manuals translated from the English language to Russian by ABDM Inc.

The entire HVAC automated control system was installed on-time and on-schedule, without the manufacturing of replacement material. Binsky & Snyder Service engineers and staff were on-site for commissioning of the automated control system. It started-up and ran without a glitch.

The control system is maintained off-site by Honeywell Inc., also located in Moscow.